Technical decision support

Wind Turbine Inspection Resources

Compare methods by the surface, signal, evidence and decision they support. Every product value stays beside its stated operating condition and source boundary.

Resource library

Choose a guide by evidence need.

Start with the method guides for planning, use the sample report to review output structure, then send the configuration checklist for a product-specific discussion.

Method comparison

Wind turbine drone inspection vs internal robots

Compare exterior aerial imagery, internal crawler evidence, access boundaries and combined inspection planning.

Compare blade methods

Equipment guide

Phased array ultrasonic testing, FMC and TFM

Separate array acquisition, full matrix capture, TFM reconstruction and procedure-dependent acceptance.

Read the PAUT guide

Measurement guide

Ultrasonic bolt tension measurement

Understand time-of-flight-based preload, calibration controls and the boundary between tightening and NDT.

Review bolt measurement

Interactive example

Sample internal blade inspection report

See how capture reference, location, review state and disclosure notes can be organised in a structured record.

View the sample report

Review preparation

Configuration input checklist

Gather the asset, access, environment, evidence and integration details that affect technical suitability.

Open the checklist

Technology note

From sensing to retained evidence

Follow the boundary between physical sensing, processing, assisted review and a final human-reviewed record.

Review the evidence chain

Configuration checklist

Six inputs for a useful first review.

The objective is to establish what must be measured, under which conditions and what evidence must be retained. Product selection follows from those inputs.

Send configuration details
  1. 01

    Asset and component

    Turbine or component type, geometry, material, age and known constraints.

  2. 02

    Access and installation

    Available openings, mounting position, cable route, safe working area and access window.

  3. 03

    Operating environment

    Temperature, visibility, precipitation, vibration and relevant site exclusions.

  4. 04

    Evidence required

    Images, measurements, raw data, event records, structured report or controller interface.

  5. 05

    Decision and acceptance

    The engineering decision, reporting standard and acceptance criteria the output must support.

  6. 06

    Integration boundary

    Data protocol, controller ownership, cybersecurity requirements and responsibilities between parties.

Product documentation

Match the document to the configuration.

Data sheets, interface descriptions and drawings may vary by model and project configuration. Tell us the model and intended application so the appropriate revision can be reviewed.

Request product data